A short-term mission in Garmisch to set up, connect, and prepare a CT Definition Force to look stunning for a professional audience.

At this point, the booth is still in the construction phase.
After 3 hours of work, the Siemens Med booth looked good again!

Three days later, dismantling took place: Everything was placed on rolling racks, onto pallets in front of the building, and the event was concluded.

Once again, many thanks to the guys from Fink Messebau and SHS Messelogistik for their assistance in installing and removing the somewhat heavy equipment!